RENEWABLE ENERGY & MARINE · Owners below 10,000 GT

Renewables

Renewable-energy marine risks, from equipment transit and offshore installation to long-term operations. Project-specific cover tailored to complex exposures, contractual obligations and changing marine conditions.

Renewable-energy projects create marine exposures at every stage: transportation, installation, commissioning and long-term operation. THALVEXIS focuses on these points of connection, where cargo, vessels, contractors, weather conditions and project schedules overlap.

Cover may be structured for renewable-energy equipment in transit or storage, offshore construction and installation, subsea cables, project cargo, marine third-party liabilities and operational physical damage. Delay in Start-Up and Business Interruption may be included where specifically assessed and agreed.
Our underwriting considers vessel suitability, contractual risk allocation, weather windows, installation methods, natural-catastrophe exposure and accumulation at ports, storage sites and offshore locations. Capacity is arranged project by project, either within THALVEXIS authority or through co-insurance and facultative reinsurance support.

Boundary: THALVEXIS assesses and negotiates risks only within written delegated authority; the participating provider retains the obligations it accepts.
At a glance
Protects:

Renewable-energy equipment, project cargo and marine liabilities across the project lifecycle.

Typical trigger:
Liability incurred in the accepted chartering capacity
We will ask for:
  • Project scope
  • Vessel suitability
  • Installation methods
  • Contracts
  • Weather exposure
  • Risk accumulation
THALVEXIS assesses and negotiates only within written delegated authority. The participating provider retains the obligations it accepts.
Marine risk is rarely one-dimensional.