Renewable-energy projects create marine exposures at every stage: transportation, installation, commissioning and long-term operation. THALVEXIS focuses on these points of connection, where cargo, vessels, contractors, weather conditions and project schedules overlap.
Cover may be structured for renewable-energy equipment in transit or storage, offshore construction and installation, subsea cables, project cargo, marine third-party liabilities and operational physical damage. Delay in Start-Up and Business Interruption may be included where specifically assessed and agreed.
Our underwriting considers vessel suitability, contractual risk allocation, weather windows, installation methods, natural-catastrophe exposure and accumulation at ports, storage sites and offshore locations. Capacity is arranged project by project, either within THALVEXIS authority or through co-insurance and facultative reinsurance support.